Post sponsored by NewzEngine.com

MIL OSI Translation. Region: Russian Federation –

December 8, 2021, 09:04

Share this

Press Service of the Mayor and the Moscow Government

An industrial and warehouse complex will be connected to it.

A high-pressure gas pipeline will appear in the settlement of Marushkinsky (at the address: 33rd kilometer of the Kiev highway). The corresponding project has already been approved, said Juliana Knyazhevskaya, chairman of the city Committee for Architecture and Urban Planning

“Technical and warehouse complexes are located near the promising route; a gasification system is required for their life. Thanks to the implementation of this project, the issue of joining the production and warehouse complex to the existing gas pipeline will be resolved, ”she said.

The area of ​​the projected territory is about 1.14 hectares.

The gas pipeline will run from the village of Postnikovo to the village of Ankudinovo and the village of Pervomayskoye of the Pervomaisky settlement along the Neznayka River to the connection point of the production and warehouse complex.

The gas pipeline will be laid within the boundaries of public and non-residential areas. At the same time, in places where rivers and reservoirs are located, it will be placed in a case to ensure the reliability and durability of gas distribution and gas consumption networks.

High pressure gas pipeline will also appear on the territory of the settlements of Voronovsky and Mikhailovo-Yartsevsky in the TyNAO. Almost 18 thousand residents will be able to connect to it.

EDITOR’S NOTE: This article is a translation. Apologies should the grammar and or sentence structure not be perfect.

MIL OSI Russia News