Post sponsored by NewzEngine.com

MIL OSI Translation. Region: Russian Federation –

Specialists of the Housing and Communal Service No. 8 (Mozdok) of the branch of the Federal State Budgetary Institution (FGBU) “Central Housing and Communal Administration” (“CHKU”) of the Russian Ministry of Defense for the Southern Military District (SMD) summed up the interim results of work during the heating period.

Since the beginning of the heating season, there have been no emergencies at communal facilities and engineering networks; energy resources are continuously supplied to housing and barracks-housing funds.

On the territory of the Mozdok and Prokhladnensky garrisons, heat supply and hot water supply is provided by the housing and communal service No. 8 of the branch of the Federal State Budgetary Institution “TsZhKU” of the Ministry of Defense of Russia in the Southern Military District, which services 44 heating facilities, of which: 23 gas, 14 coal and 1 electric boiler, as well as 6 small heat generating facilities. Thermal networks with a length of 44092.6 m.

The successful implementation of the heating period also depends on the uninterrupted supply and maintenance of the necessary fuel supply at boiler houses, contracts for the supply of gas and coal have been concluded. Fuel delivery is carried out in a timely manner, without failures. Reduction of standard stocks is not allowed.

For the prompt elimination of possible emergencies, an emergency repair team of 11 people is working, equipped with the necessary tools, vehicles and special equipment.

The administrative, managerial and line personnel of the housing and communal service No. 8 (Mozdok) of the branch of the Federal State Budgetary Institution “TsZhKU” of the Ministry of Defense of Russia for the Southern Military District have taken all measures to successfully ensure the heating period.

1 2 3 4 5

EDITOR’S NOTE: This article is a translation. Apologies should the grammar and/or sentence structure not be perfect.

MIL OSI Russia News