Post sponsored by NewzEngine.com

MIL OSI Translation. Region: Russian Federation –

January 17, 2022, 12:53

Share

Design decision

Preparatory work is currently underway at the construction site.

In the Babushkinsky district, the construction of a residential building for resettlement began under the renovation program. It will be erected at the address: Pilot Babushkin Street, property 29, building 5. This was announced by the head Department of construction of the city of Moscow Rafik Zagrutdinov.

“Currently, the work of the preparatory period is underway: the installation of temporary fencing of the construction site, permanent and temporary roads, storage areas,” he added.

The residential building will be built according to an individual project. For the external finishing of the ventilated facade of the building, clinker ceramic tiles, metal cassettes and fiber-reinforced concrete panels are used, baskets for air conditioners will be installed. The entrance to the building will be decorated with stained glass windows. An underground single-level parking will be placed under the territory of the courtyard.

The new building will have 86 apartments: 13 one-room, 61 two-room and 12 three-room. The finished improved finish in them will fully comply with the standards of the renovation program.

Shops, cafes, beauty salons, sports clubs, clubs and sections for children can open on the ground floor of the house. In the lobby of the residential part, a pram room, a concierge room, a pantry for cleaning equipment and mailboxes will be organized.

The new building will be equipped with security systems for entrances, video surveillance, warning and evacuation control in case of fire.

The area around the house will be landscaped. Playgrounds for children, recreation areas will be equipped in the yard, lawns and flower beds will be planted, trees and shrubs will be planted.

The renovation program was approved in August 2017. About a million Muscovites from 5,175 old houses will move into modern apartments with improved finishes. 534 launch pads have been selected. Within the framework of the program already built and put into operation 177 new houses with an area of ​​2.3 million square meters.

EDITOR’S NOTE: This article is a translation. Apologies should the grammar and or sentence structure not be perfect.

MIL OSI Russia News