Post sponsored by NewzEngine.com

MIL OSI Translation. Region: Russian Federation –

January 25, 2022, 07:04

Share

It was built as part of the first stage of development of the road network on the territory of the Kommunarka administrative and business center.

On the territory of the administrative and business center (ADC) Kommunarka, 1.66 kilometers of roads are being prepared for commissioning, including a bridge across the Sosenka River.

“Today, the first stage of development of the road network is being implemented on the territory of the Kommunarka ADC. Now at the stage of obtaining permission to put into operation 1.66 kilometers of roads, including the bridge across the Sosenka River,” said the Deputy Mayor of Moscow for Urban Planning Policy and Construction

Andrey Bochkarev.

The territory development operator is Mosinzhproekt JSC. According to the company’s CEO Yuri Kravtsov, on the territory of the Kommunarka administrative and business center, work is also underway to build intra-quarter roads with a length of about 10 kilometers, two overpasses over the Kaluga highway and a tunnel-type overpass over local roads.

“As part of the first stage of the development of the road network, it is planned to complete the construction of 13.34 kilometers of roads. In 2019-2021, four sections with a total length of 4.92 kilometers have already been commissioned here, including overpasses over the Solntsevo-Butovo-Varshavskoe highway. Also, work has been completed on additional design of the objects of the first stage of the road network,” added Yuri Kravtsov.

ADC Kommunarka will become one of the centers for the development of the TiNAO. In total, it is planned to build about five million square meters of real estate here and create 80,000 jobs.

EDITOR’S NOTE: This article is a translation. Apologies should the grammar and or sentence structure not be perfect.

MIL OSI Russia News