Post sponsored by NewzEngine.com

MIL OSI Translation. Region: Russian Federation –

January 27, 2022, 13:02

Share

About 150 families will be able to move into the new house.

In Koptevo this year, the first house built according to renovation program. After the building is put into operation, about 150 families will be able to become owners of new housing, said the head of the capital Department of urban planning policy Sergei Levkin.

“The new residential building is located at the address: Sobolevsky proezd, house 20b. There are 161 apartments in the new building, all of them are finished. On the territory of the Koptevo district, this will be the first house to be occupied under the renovation program. About 150 families will soon be able to start moving,” he said.

The head of the department also explained that Koptevo will become the eighth district in the Northern Administrative District, where the start of resettlement under the renovation program is planned.

In total, within the framework of the renovation program, 123 residential buildings with an area of ​​390.4 thousand square meters are subject to resettlement in the district, five of which will be preserved and reconstructed. In total, 23.4 thousand residents became participants in the program.

In Koptevo, eight launch sites have been identified for the construction of houses and the organization of a wave resettlement of residents.

Renovation program: over 300 houses designed and built in Moscow How the renovation program works

The renovation program was approved in August 2017. For its implementation, 534 launch pads were selected. Already built and put into operation 178 new houses with an area of ​​2.3 million square meters.

EDITOR’S NOTE: This article is a translation. Apologies should the grammar and or sentence structure not be perfect.

MIL OSI Russia News