Post sponsored by NewzEngine.com

MIL OSI Translation. Region: Russian Federation –

January 30, 2022, 09:03

Share

Design decision

The total area of ​​new buildings will be about 17 thousand square meters.

In the settlement of Krasnopakhorsky (TiNAO), the second stage of the equestrian complex will be built.

“The new buildings will be made in the same style as the buildings of the first stage. Imitation of a wooden beam, natural stone, plaster of several shades were chosen for facing,” said the chief architect of the city of Moscow.

Sergey Kuznetsov.

As part of the second stage, it is planned to build eight stables. There will also be an arena with an administrative complex and auxiliary buildings: a forging shop, a veterinary station and others. In addition, show jumping and training fields, guest houses, and exercise equipment will be installed on the territory.

The total area of ​​new buildings will be about 17 thousand square meters. All buildings of the complex will be connected by convenient walkways and driveways. The surrounding area will be landscaped and landscaped.

EDITOR’S NOTE: This article is a translation. Apologies should the grammar and or sentence structure not be perfect.

MIL OSI Russia News