Post sponsored by NewzEngine.com

MIL OSI Translation. Region: Russian Federation –

January 31, 2022, 18:41

Share

Design decision

The building has 110 apartments and underground parking.

A permit for commissioning was issued for a house under the renovation program in the Ochakovo-Matveevskoye district, said the chairman Mosgosstroynadzor Igor Voystratenko.

The new building of variable number of storeys is located on Bolshaya Ochakovskaya street (possession 35a). The house with a total area of ​​11.9 thousand square meters has 110 apartments with improved finishes. The first floor of the building will be occupied by infrastructure facilities, a public information center and technical premises designed to service the house.

“Mosgosstroynadzor pays special attention to the quality of work at residential facilities under the renovation program. A total of 21 inspections were carried out during the construction of the house. At all stages of construction, specialists from the Center for Expertise (CEIIS) were involved, who participated in seven inspections and performed a set of laboratory and instrumental studies on the quality of work and materials used,” said Igor Voystratenko.

The building is equipped with warning and evacuation control systems in case of fire, automatic fire alarms, as well as security systems for entrances and video surveillance. For the convenience of residents, underground parking for 45 cars is provided.

Near the house there is a playground and a guest parking lot for cars, the territory was landscaped.

The renovation program was approved in August 2017. About a million Muscovites will move into modern apartments with improved finishes, the resettlement of 5175 houses is planned. Already built and put into operation 178 new houses with an area of ​​2.3 million square meters.

EDITOR’S NOTE: This article is a translation. Apologies should the grammar and or sentence structure not be perfect.

MIL OSI Russia News