Post sponsored by NewzEngine.com

MIL OSI Translation. Region: Russian Federation –

February 3, 2022, 12:59

Share

Underground parking, a playground and a recreation area were made for residents.

In the Ochakovo-Matveevskoye district, a house was put into operation under the renovation program. It is located at the address: Bolshaya Ochakovskaya street, property 35a.

“On the top floor of the building, there are two exploitable terraces that can be used as comfortable areas for residents to relax,” said the head

Moscow Construction Department Rafik Zagrutdinov.

A single-section building of variable number of storeys was built according to an individual project. The basement and the first floor of the house were finished with porcelain stoneware panels, and a system of ventilated facades lined with fiber cement sheets was made above.

The house has 110 apartments: 31 one-room, 67 two-room, 12 three-room. The first floor is non-residential: shops, cafes, beauty salons, sports clubs, clubs and sections for children can be opened here.

The vestibule of the residential part is equipped with a pram room, a concierge room, a pantry for cleaning equipment, and mailboxes. The new building was equipped with systems for guarding entrances, video surveillance, access control and management, warning and evacuation management in case of fire, and fire alarms.

The area around the house has been landscaped. The courtyard was equipped with a playground and a recreation area. An underground single-level parking lot was made under the territory of the courtyard. There are also parking spaces in the open flat parking, including for people with limited mobility.

The renovation program was approved in August 2017. For its implementation, 534 launch pads were selected. Thanks to the program, about a million Muscovites will move to new apartments with improved finishes.

EDITOR’S NOTE: This article is a translation. Apologies should the grammar and or sentence structure not be perfect.

MIL OSI Russia News