Post sponsored by NewzEngine.com

MIL OSI Translation. Region: Russian Federation –

February 3, 2022, 13:54

Share

Design decision

Most new buildings are located in the areas of Golovinsky, Beskudnikovsky and Koptevo.

According to the renovation program, 25 houses are being built in the Northern Administrative District of the capital, the same number is at the design stage. This was announced by the head of the Department of urban planning policy of the city of Moscow Sergei Levkin.

“The housing construction area in the SAO is 803.1 thousand square meters. The largest number of houses is located in the Golovinsky district (14), there are nine objects in Beskudnikovsky, and 10 in Koptev,” he specified.

The renovation program in the SAO includes 514 houses, where 109 thousand people live. For their wave migration, 66 launch sites have been selected. “Now 23 new buildings have been put into operation, of which 21 houses have already been transferred for settlement,” Sergey Levkin added.

Formerly Deputy Mayor of Moscow for Urban Planning Policy and Construction Andrey Bochkarevsaid that more than 180 houses have been put into operation in the capital since the launch of the renovation program. Of these, 151 new buildings were transferred for settlement.

The renovation program was approved in August 2017. About a million Muscovites will move into new apartments with improved finishes. 534 launch sites have been selected for the implementation of the program.

EDITOR’S NOTE: This article is a translation. Apologies should the grammar and or sentence structure not be perfect.

MIL OSI Russia News