Post sponsored by NewzEngine.com

MIL OSI Translation. Region: Russian Federation –

February 20, 2022, 09:03

Share

Photo by E. Samarin. Press Service of the Mayor and the Government of Moscow

The 2.4 km long structure is being built as part of the northern part of the high-speed diameter.

The construction of one of the longest flyovers in the capital is 76 percent complete. It is erected on the northern segment Moscow High Speed ​​Diameter.

“As part of the construction of a section of the northern part of the high-speed diameter from Dmitrovskoye to Yaroslavskoye Highway, one of the longest flyovers in the capital with a length of 2.4 kilometers is being built today. At the moment, its construction is 76 percent completed,” said Deputy Moscow Mayor for Urban Planning Policy and Construction

Andrey Bochkarev.

This will be the overpass of the main course of the new route, which will stretch from Dmitrovskoye to Altufevskoye Highway, cross the section of the Oktyabrskaya Railway, the connecting railway line and the Savelovskoye direction of the Moscow Railway.

“Currently, the span structures of the overpass and cable ducts are being installed, the retaining walls are already fully prepared,” Andrey Bochkarev noted.

Moscow high-speed diameter– a possible name for the new city highway, which will appear after the unification of the North-Eastern and South-Eastern chords. The 68-kilometer route will be comparable in scale to the Moscow Ring Road. It will connect the largest outbound highways and 44 districts of the capital. On the high-speed diameter it will be possible to drive through the entire city, bypassing the center, in 40 minutes without a single traffic light.

EDITOR’S NOTE: This article is a translation. Apologies should the grammar and or sentence structure not be perfect.

MIL OSI Russia News