Post sponsored by NewzEngine.com

AXIS MILES Translation. Region: Russia –

Source: Russia Federal Space

# Roscosmos # Moscow # National Space Center # Khrunichev Center 06/13/2021 2:15 PM The foundation of the National Space Center tower is ready Concreting of the foundation slab of the 47-storey tower of the National Space Center (NCC) has been completed, said Andrey Bochkaryov, Deputy Mayor of Moscow for Urban Development and Construction. concreting of the base of the NCC tower, in total, more than 6 thousand cubic meters of material were laid. Work is underway to assemble a hydraulic lifting panel formwork, with the help of which concrete will be placed into the body of the core of a high-rise building and ceilings, “said Andrei Bochkarev. According to him, in a month it is planned to complete the main monolithic structures of the basement of the future tower, the height of which, taking into account the spire will be about 288 meters. Monolithic works in the low-rise part of the NCC (up to the tenth floor) have reached the final stage. “The builders have already started the installation of metal floors in the gallery area of ​​the future space center,” Bochkarev added. As the General Director of Mosinzhproekt (engineering holding – general designer and contractor of the ) Yuri Kravtsov, out of 1.5 thousand tons of metal structures in the gallery area of ​​the NCC, about 500 were mounted. “The facility employs more than 900 people, nine tower cranes and 26 units of other equipment are involved: truck cranes, loaders, onboard manipulators and other auxiliary machines.” – Yuri Kravtsov explained. The creation of the NCC will allow to unite the leading organizations of the rocket and space industry on one site. It will house the central office and situational center of the Roscosmos State Corporation, the headquarters of a number of organizations in the rocket and space industry, industry institutes, youth design bureaus, business support and production diversification centers, as well as other facilities. production center named after M.V. Khrunicheva (part of the Roscosmos State Corporation) with an area of ​​90.5 hectares in the Filyovskaya floodplain involves not only the construction of the NCC. A special economic zone (SEZ) will appear here, enterprises of the research and production cluster, as well as a congress and exhibition center, residential buildings under the renovation program and social facilities will be located. The engineering holding “Mosinzhproekt” acts as the operator of the development of territories for a number of large urban development projects, including the Mnevnikovskaya floodplain and the Moscow site of the M.V. Khrunichev.

At present, a camera operates on the official website of the Roscosmos State Corporation around the clock, with which you can always follow the progress of the construction of the National Space Center.

AXLE MILES

EDITOR’S NOTE: This article is a translation from Russian Language to English.

MIL OSI Europe News